• Project Name: Lumut Block 3 650MW Combined Cycle Power Plant
  • Location: Segari, Lumut, Perak, Malaysia
  • Mechanical & Electrical Erection Work – 1 unit Steam Turbine Generator, Auxiliaries System & BOP Equipment and Piping
  •  

 

Installation of LP Turbine Upper Casing

 

 

Installation of LP Turbine Rotor

 

Installation of Condenser​​​​​​

 

 

 

Installation of HP Turbine

 

 

Lifting of Feedwater Tank

 

 

Installation of Main Cooling Water Pump​​​​​​

 

 

Water Steam Cycle Piping Erection

 

 

Installation of MV Switchgears

 

 

Installation of Battery Bank for DC System

​​​​​​

 

Installation of Isolated Phase Bus Duct System

 

 

Installation of HP Feedwater Pump

 

 

Control Cable Termination​​​​​​

 

 

Honing of ST-Generator Coupling Bolt Hole

 

 

Cable Termination