Alignment and Installation of H2 Compressor Flywheel
|
Electrical Work Near BOP Area
|
Fit-up and Welding Top Cover of LIN Drain Pit
|
Installation of Ex. Proof Lighting at BOP Area
|
Installation of H2 Compressor
|
Installation of Lighting Arrestor Near LIN Tank Area
|
Installation of Pipe Rack
|
Installation of Pipe Support at BOP Area
|
Laying Cable Tray onto Special Support
|
Piping Installation Work near LIN Tank Area
|
Tandem Lifting and Installation of LIN Tank
|
Tubing Installation at H2 Reduction Skid
|