Installation of Main Cooling Water Pumps
|
Installation of Stacker Reclaimer
|
Installation of SWFGD Ducting
|
Installation of Gantry Crane at Intake
|
Insulation Work on SWFGD Ducting
|
Assembly of SWFGD Ducting
|
Erection of CHS conveyor structures
|
Erection of CHS Transfer Tower A
|
Erection of Gas-Gas Heater
|
Erection of Stacker Reclaimer
|
Erection of SWFGD Main Structures
|
Erection of SWFGD Oxidation Blower 1 |
Fit-up and Welding of SWFGD Duct Panels
|
Installation of CSU rails
|
Installation of Girder for Conveyor Belt
|
Installation of MCW pump
|
Lifting of CHS Gallery Structure
|
On-site Machining on Gas Gas Heater 1
|
Stacking of SWFGD Absorber Packing
|