GALLERY
 

GAS TURBINE

Erection of Thermal Block - Rigging - Segari Power Plant
Complete Air Intake Filter House - Segari Power Plant
Assembly of Stack Ring - Segari Power Plant
Installation of Round to Square Transition - Segari Power Plant

Installation of EV & SEV ring line - Senoko Power Plant
Generator into position - Senoko Power Plant
Check Gas Turbine Bearing No. 4 - Senoko Power Station
Preparation for rigging in Gas Turbine  - Senoko Power Plant
   
Generator- Haifu Power Station
Installation of Diffuser of Gas Turbine  - Haifu Power Station
Lifting of heavy equipment - Haifu Power Station
Rigging of Thermal Block - Haifu Power Plant
 
 
Copyright © Impian Tekad Sdn. Bhd.
All rights reserved.
Developed by MC Adventura Sdn Bhd