Haifu Power Station – Taiwan

  • Mechanical Erection of 4 x 160 MW ABB K24 Gas Turbines and 2 x 160 MW Steam Turbine, Balance of Plant and Piping.

Asea Bowin Boveri

(Now known as Alstom Power Asia Pacific)
1998 - 1999
 

Senoko Power Station – Singapore

  • Mechanical Erection of 1 x 250 MW ABB GT 26 Gas Turbines and associated auxiliaries and piping works.
Alstom Power Asia Pacific Sdn Bhd
2000
 

Senoko Power Station – Singapore

  • Electrical Installation of   1 x 250 MW ABB GT 26 Gas Turbines, 1 x 120 MW rehabilitated Steam Turbine and associated systems.
Alstom Power Asia Pacific Sdn Bhd
2000
 

Pahlawan Power Station – Melaka

  • Rehabilitation of Melaka Pahlawan Power Station.
Pahlawan Power Station Sdn Bhd
2000
 

Bang Bo Power Plant – Thailand

  • Design and build Site Office for Bang Bo Power Plant in Thailand.
Alstom Power (Thailand) Ltd
2000
 

Samsung Corning – Seremban

  • Installation of a new and relocation of LEHR conveyor/dryer line.
Samsung Engineering Sdn Bhd
Mar 2001
 

Samsung Corning – Seremban

  • Relocation and Installation of Trolley Conveyor.
Samsung Engineering Sdn Bhd
May 2001
 

Haifu Combined Cycle Power Plant – Taiwan

  • Supply of manpower for Modification work.

Asea Bowin Boveri

(Now known as Alstom Power Asia Pacific)
May 2001
 

Senoko Power Plant – Singapore

  • Supply of manpower for Commissioning work.
Alstom Power Asia Pacific Sdn Bhd
June 2001
 

Segari Power Plant – Lumut, Perak

  • Mechanical   and   Electrical Installation of 3 x 145 MW 13E2 Gas Turbine and Balance of Plant.
Alstom Power Asia Pacific Sdn Bhd
June 2001
 

Segari Power Plant – Lumut, Perak

  • Mechanical and Electrical Erection of 3 x KA 13E2 Heat Recovery Steam Generator.
Alstom Power Asia Pacific Sdn Bhd
Aug 2001
 

Haifu Combined Cycle Power Plant – Taiwan

  • Supply of manpower for maintenance works.
Asea Bowin Boveri (Now known as Alstom Power Asia Pacific)
Dec 2001
 

Segari Power Plant – Lumut, Perak

  • Mechanical and Electrical Erection of 3 x KA 13E2 Steam Turbine, Balance of Plant and Piping.
Alstom Power Asia Pacific Sdn Bhd
Jan 2002
 

Senoko Power Plant – Singapore

  • Supply of Manpower for Modification Work of 1 x 250 MW Alstom GT26.
Alstom Power Asia Pacific Sdn Bhd
May 2002
 

Perlis Power Plant – Perlis

  • Mechanical and Electrical Erection of 3 x KA 13E2 Heat Recovery Steam Generator.
Alstom Power Asia Pacific Sdn Bhd
Oct 2002
 

Perlis Combined Cycle Power Plant – Perlis

  • Mechanical and Electrical Erection Works for 675MW 3 x KA 13E2  Gas Turbines, Steam Turbine, Balance of Plant and Piping.
Alstom Power Asia Pacific Sdn Bhd
Nov 2002
 

Segari Power Plant – Lumut, Perak

  • Maintenance Works.
Alstom Power Asia Pacific Sdn Bhd
Jun 2004
 


Stormwater Management and Road Tunnel (SMART) Project – Kuala Lumpur

  • Design, Fabricate, Installation and Commissioning of Roller Gates and Stoplogs at Intake from Attenuation Pond (Location 9) and Outfall to Sungai Kerayong (Location 10).
MMC - GAMUDA JV

Jul 2004

In Progress
 


JOR, WOH, HABU and ODAK Power Stations – Cameron Highlands, Pahang

  • Manufacturing, assembly, testing, disassembly, transportation and site installation of equipment to the Power Stations Cooling Water and Drainage Systems (Part A).
Siemens Malaysia Sdn Bhd

Jul 2004

In Progress
 

JOR, WOH, HABU and ODAK Power Stations – Cameron Highlands, Pahang

  • Mechanical and Electrical Rehabilitation.
Siemens Malaysia Sdn Bhd

Aug 2004

In Progress
 

Stormwater Management and Road Tunnel (SMART) Project – Kuala Lumpur

  • Design, Fabrication, Installation and Commissioning of Roller Gates and Stoplogs at Tunnel Outfall (Location 8).
MMC - GAMUDA JV

Dec 2005

In Progress
 

Teluk Salut Power Station – Kota Kinabalu, Sabah

  • Erection of Mechanical Equipment – Heat Recovery Steam Generator, Steam Turbine, Air Cooled Condenser and Other Plant Equipment for Teluk Salut 190MW Combined Cycle Conversion Project.
Ranhill Engineers and Contractors Sdn Bhd

Mar 2006

In Progress
 

Tuanku Jaafar Power Station, Port Dickson Rehabilitation Project Phase 2

  • Project and Site Management for Mechanical & Electrical Erection of 750MW Combined Cycle Power Plant.
TPSC Engineering (M) Sdn Bhd

K&P Sikojaya
Sdn Bhd

Mar 2007

In Progress
 

SembCorp Cogeneration Plant C Jurong Island, Singapore

  • 1 x 400tph Gas Fired Boiler Site Mechanical & Electrical Erection at SembCorp Cogeneration Plant, Jurong Island.
Austrian Energy & Environment (Australia) Pte. Ltd

Apr 2007

In Progress
 
 