PROJECT HIGHLIGHTS
 

ROLLER GATES AND STO LOGS FOR SMART PROJECT, KUALA LUMPUR

  • Design, Fabricate, Installation and Commissioning of Roller Gates and Stoplogs at Intake from Attenuation Pond (Location 9) and Outfall to Sungai Kerayong (Location 10) for Stormwater Management and Road Tunnel (Smart) Project, Kuala Lumpur.
  • Design, Fabrication, Installation and Commissioning of Roller Gates and Stoplogs at Tunnel Outfall (Location 8) for Stormwater Management and Road Tunnel (Smart) Project, Kuala Lumpur .
  • Construction started in Jul 2004 and still in progress.
  • Client: MMC - GAMUDA JV

Installation of Hydraulic Cylinder - Smart Tunnel

   

Lifting of Roller Gate

Installation of Roller Gate

   
 